Study 2016

Tadoussac Ferries: Installation of a Mooring Dolphin at the Tadoussac Wharf, Environmental Impact Study

Appendix KA

megatraversiers

Commissioned by: The Société des Traversiers du Québec (STQ)

The authors:

  • Roche Ltd, Consulting Group

The structure

Construction of two ferries of about 115 car-equivalents to replace the three current ferries of about 75 car-equivalents each.

Main observations and comments

Here is an excerpt from a brief being prepared by the Société du Pont sur le Saguenay following the hearings requested from the BAPE concerning this 2016 impact study, prepared in July 2015 (K1 to K5)). Citizens, municipalities and businesses asked that a public hearing be held on this installation project before the deadline of July 2, 2016. To date, the Minister of the Environment has not responded to this request. Yet this is the only opportunity that has arisen for users of Route 138 between Québec City and the Côte-Nord to express themselves on this unilateral decision by the Société des Traversiers — a decision that will have major impacts on road safety, on traffic flow and on the regional economy as a whole.

The ferries: the current situation and its consequences

The announcement in September 2009 of the construction of two larger ferries to replace the three existing ones, which still have a useful life of 15 years, surprised us, and we sought to understand why such a decision was taken. Indeed, considering the traffic problem as a whole between La Malbaie and Les Escoumins, i.e. the sections of Route 138 on either side of the crossing, the decision to replace three ferries with two of higher tonnage will reduce traffic flow and road safety on Route 138. Access to the region will tighten.

The MTQ acknowledges that 30% of the accidents and deaths on this road segment may be linked to the presence of the crossing (2009 Impact Study). But the Government nevertheless decided to invest more than 200 million in new ferries that will have a lower frequency. Thus the size of the platoons of vehicles surging out of the ferries will increase by 52% on Route 138, on both sides of the Saguenay. Is this a way to improve road safety and traffic flow? That is what the STQ claims when it justifies its project to build a mooring dolphin at the Tadoussac lay-by wharf.

These sections of Route 138, on either side of the Saguenay crossing, do not have the configuration required to allow the passing necessary to dissolve the platoons of 75 car spaces leaving the current ferries. What will happen when the platoons are 115 vehicles?

The STQ’s project is limited to the safe operation of its future ferries. It does nothing to improve road safety on Route 138; on the contrary, it will worsen the situation unless massive investments are made in the approach roads — investments that will exceed the construction costs of a bridge and that will maintain the long-term isolation of the Côte-Nord region and of eastern Canada.

We initially believed that the decision to replace 3 ferries with 2 larger ones was a mistake, since it was obvious that larger ferries would require a review of the road transport problem on Route 138. Already 15 years ago, the MTQ engineers responsible for the Côte-Nord, familiar with the problems of the ferry syndrome and of users anxious to pass the slowest vehicles, specified in the MTQ Project Notice on the bridge impact study (April 2002) that the ferry service was frequently saturated and that the limits of alternative solutions seemed to them to have been reached. Despite numerous representations and appeals from the regional community, the decision to build ferries went ahead, against all apparent logic, and the 2 engineers who prepared the project notice were transferred out of the region and an urban planner of Montréal origin was appointed head of the 2009 Impact Study.

Continuity, traffic flow and safety on Route 138 near the Tadoussac crossing are all issues that depend on three different administrative units of the MTQ as well as on the municipalities located along its route, the Sûreté du Québec, Parks Canada and Parcs Québec. Coordination among all these stakeholders is very difficult. Reading the MTQ’s organization chart, one notes that the Capitale-Nationale and Côte-Nord territorial offices are under the authority of the Deputy Minister, while the Société des Traversiers du Québec is under the direct authority of the Minister. Hence communication problems and unilateral decisions without consultation. No planning of direct and indirect costs was done among the MTQ stakeholders. It is a bit as if the STQ decided to build 2 large ferries to replace the current 3 and “après moi le déluge”: the territorial divisions will have to adapt and invest subsequently without being able to measure the costs. This confusion is reflected in the immediate approaches to the ferries: see the STQ’s “Minutes of the Tadoussac–Baie-Sainte-Catherine Regional Advisory Committee” of May 8, 2002. The confusion described there must also be carried over to the road safety of the approach roads to the crossing and to the consequences of the decisions of the STQ, which operates exceptionally at Tadoussac by ensuring the continuity of a national highway serving 20% of Québec’s territory and 6% of Canada’s. As for the file of the bridge linking the Capitale-Nationale region to the Côte-Nord at Tadoussac — an interregional bridge, therefore — its management was entrusted to the Côte-Nord office. This territorial office has no expertise in suspension bridges, whereas the Capitale-Nationale region has the expertise of maintaining two suspension bridges and has a higher level of expertise while being close to the MTQ’s offices. However, considering the Ministry’s organization chart, one notes that the Société des Traversiers du Québec has full authority to do as it pleases, since it reports directly to the political level, to the Minister, whereas the regional offices must report to several intermediaries before they can be heard at the Minister’s office.

question-1243504_640

The decision to build 2 large ferries for eventual use on the Saguenay crossing appears incomprehensible to us. Why go ahead with 2 new ferries when it is well known that this solution will worsen the situation by breaking the delicate balance between the frequency of the ferries, their boarding capacity and the capacity of the roads on either side to absorb platoons of vehicles, nearly 20% of which are tractor-trailers? The approach road sections do not have sufficient passing zones, nor do they meet provincial standards for grades and curves, to allow the platoons currently formed at the exit of the ferries to be dissolved.

We noted that the announcement of these new boats followed by less than a month the publication of the impact study on the Tadoussac Bridge in August 2009. This proximity, indeed instantaneity, of the decisions appeared incomprehensible to us, considering that the study itself showed that the current boats would not have to be replaced before 2025 and that their replacement cost would be 42 million each.

Why this sudden reversal?

Our main concerns are road safety and the development of the Côte-Nord. Recall that in December 2014, a tractor-trailer suffered brake failure and rammed 6 vehicles on the ferry, injuring one person. With 115 vehicles, how will such an event be managed? What will happen when the new, large ferries are pushed off course by ice in winter? The ferry captains point out in the 2002 study on the extension of the Tadoussac wharf that the mouth of the Saguenay at Tadoussac is one of the most dangerous places to navigate in the world because of the currents, tides, ice, etc. Reading the judgment issued by the Administrative Labour Tribunal concerning the decision of the captains and officers to refuse to train apprentice captains prompts reflection on access to a fluid road.

What means will the STQ have to take to ensure maritime safety?

Already, the Côte-Nord is the only region of Québec that can be held hostage during the labour disputes that recur at the crossing, and now the captains threaten to refuse to train apprentices to navigate these difficult waters despite the tribunal’s decision (see the decision of the Administrative Labour Tribunal of June 6). Which region of Québec would accept to see its access closed or restricted for several days by a labour dispute? Yet this is what users of Route 138 on the Côte-Nord experience.”

Excerpt from a brief to be presented to the BAPE if the Minister of the Environment agrees to hold public hearings on the project to install the mooring dolphin (mooring post) at Tadoussac.

A copy of the Impact Study is available from the BAPE (Bureau d’audiences publiques sur l’environnement)

  • It will be noted that while traffic is declining (K6 to K15), the Société des Traversiers asserts in the 2016 Study that it is growing. The STQ forecast operating costs in 2011 of $9.5M (2001) (Appendix K7), whereas in reality they would be $10.8M (2001) (Appendix K8), 14% over forecast.
  • The STQ submits that it has an increase in demand for crossings (K2) while traffic is declining. (K10)
  • The STQ is pleased with a high satisfaction rate in its annual customer satisfaction survey. However, this survey is conducted in July or August, when 4 out of 5 passengers are visitors or tourists (280,000 passengers in August 2014, whereas regular, habitual passengers number 59,000 in February). In doing so, the STQ annually transmits to the National Assembly complacent results regarding the satisfaction rate of habitual users. (K11)
  • The number of alerts issued in the summer of 2014 indicates an alert rate 4 times higher (65) than on the crossing with the second-highest number of alerts: Québec–Lévis (15) (K12).
  • The STQ is increasing the number of employees at the ferries while the customer base is declining. (K13 to K15)

The Société du Pont is unable to obtain relevant information from the STQ, which systematically refers our requests to the Act respecting access to documents held by public bodies and the protection of personal information. Considering the remoteness of North Shore residents and the absence of universities or scientific groups interested in regional issues, the procedure imposed by the STQ amounts to a flat refusal. Indeed, this closed attitude of the Société imposes a procedure and delays that make a complete analysis of the operation of this Société and of the total costs it generates for Québec taxpayers impossible. (K16, K17)

The Société du Pont prepared a comparative summary of the costs of the ferries with those of the bridge of the 2015 Study, based on the available public documents and maritime transport standards. The results confirm the conclusions of the 1973 and 1976 studies by T. Monti, Eng. PhD, and of the 1986 study by P. Brisset et al. No study in which the MTQ was involved gives an accurate picture of the total costs of the ferries. (K18, K83, K84)

We present some excerpts from positions taken by Côte-Nord industrialists concerning the ferry service at Tadoussac. (K19 to K23)

The Société du Pont made representations to Deputy Premier Nathalie Normandeau in March 2010 during a meeting in Baie-Comeau. It presented the reasons why it considered it preferable to keep the status quo of 3 boats rather than build 2 larger boats pending the construction of a bridge. At the time, we believed that the project of the 2009 study was the only one possible. We pointed out to her that the province would save $500M in the medium term by avoiding these large boats, considering the road works that would quickly become necessary to bring the road up to standard and the cost of the ferries. The government continued the construction process to save the Davie shipyard from bankruptcy. It appeared that the safety of users and the traffic flow of Route 138 were not considered when this decision was taken. (K24 to K28 and K43)

In 1996-1997, the STQ carried out the mid-life refits of the current ferries while increasing vehicle spaces from 60 to 75 vehicles. A few years later, the boat captains found that this 15-metre lengthening of the boats created perilous situations in waters considered among the most dangerous to navigate in the world. The Tadoussac wharf therefore had to be extended to secure the manoeuvres (K29 to K31). Currently, without prior consultation and without prior planning either, the STQ is having ferries built that are 10 metres longer and wider. There is reason to wonder about the foreseeable costs of extending the Tadoussac wharf into deep water to once again protect the ferry captains’ manoeuvres.

We attach a document indicating the MTQ’s mission. Certain elements of its mission and vision do not seem to be considered in the Tadoussac Bridge and ferries file. The counter-culture that distances the MTQ from its mission actively contributes to the stagnation of the Côte-Nord region and to the difficulties of implementing the Plan Nord. (K32 to K47).

The harm to road safety has long been known. A few years ago, information concerning road accidents was transferred to another agency under the authority of the Québec Minister of Transport, the SAAQ. Yet in 2010, the accident reports completed by the police were modified, and the current data are no longer comparable with those collected when the coroner Arnaud Samson described the ferry syndrome. Over five-year periods, the number of reported accidents fell from 928 between 1995 and 1999 to 303 in the period 2011 to 2015, and the number of deaths between La Malbaie and Les Escoumins went from 22 in 1995-1999 to 3 between 2011 and 2015 (K80 to K82). Figures that are hard to understand, especially considering that in the last 3 years the number of deaths on Côte-Nord roads has increased by 12% according to the SAAQ’s annual report. (K48)

The Société du Pont, like other municipal bodies and businesses, requested a public hearing from the BAPE concerning this STQ mooring dolphin project in June 2016 and has still not received notice from the Minister of the Environment as to whether or not public hearings will be held. (K49 to K52)

The disruptions and unpredictability of travel times at the Tadoussac crossing are numerous and have serious consequences for traffic flow, road safety and the dynamism of the North Shore economy. (K53 to K63)

The information obtained from the STQ is very limited, and the variation in the presentation of the Société’s annual reports from one year to the next does not make it possible to establish the total costs of the Tadoussac crossing. (K64 to K70)

Various documents of interest enrich the Société du Pont’s analysis (K71 to K79)

The STQ is an entity from which it is very difficult to obtain accurate and complete information. This is one of the reasons why the Société du Pont is asking the Minister of Transport for a meeting, since he is the only person who can require rigorous, objective and complete information from the entities under his responsibility.

To see in more detail the important appendices cited above: Click here