Study 1986

Presentation of a Bridge Project over the Saguenay River

Appendix CA

VuePont

Commissioned by: Independent

The authors

  • Pierre Brisset, architect; BCPTA consultants, highway and traffic engineering
  • Francis Boulva and Associates, structural engineering

The structure

The experts excluded alignments in the estuary or near the current ferries

They propose two alignments at La Boule, upstream of the power lines.

A suspension bridge is proposed with a tunnel under the La Boule mountain and no tunnel on the south shore. This structure has a deck 70 metres above the water, which would match the suggestions of the COWI experts in the 1999 opportunity study.

Main observations

  • This study confirms that the optimal option is at La Boule for economic and environmental reasons. Moreover, a bridge in the estuary would permanently alter the beauty of the estuary and of the village of Tadoussac, it states.
  • A few variants are proposed, including a bridge of reasonable height above the water (70 m) which corresponds fairly well to the recommendation that the international experts would make in the 1999 study, to lower the height of the deck in order to reduce costs. (E13)
  • Option 2D (G6) makes it possible to avoid a tunnel on the south shore and to lower the deck, a recommendation of the 1999 B&T, COWI study.
  • A 600-metre tunnel under La Boule is noted, comparable to the China Bar tunnel on the Trans-Canada Highway in British Columbia. That 750-metre tunnel has allowed the passage of vehicles and tractor-trailers since the 1960s.

The Minister of Transport conveys the message of senior officials to the effect that the justification for a bridge must be based on the forecast growth in traffic (C11, C12), and yet already in 1976 the engineer and economist Monti explained that the road was saturated by the ferry service and that it exerted a growing deterrent effect on potential users. Here is a vicious circle in which the ferries prevent traffic growth, given their unpredictability and the dangers they create on the approach roads, while the only obvious solution for all users, a bridge, cannot be built on the pretext that there are not enough users. Yet the real question is: Which option is the most efficient and economical for Québec taxpayers: maintaining ferries and their crews year-round, day and night, or building a bridge? And in the future, would it be preferable to reallocate the public funds paid to the ferries to the financing of a bridge, knowing that the latter will have no crews or fuel, will not have to undergo a major modernization after 20 years and be replaced after 40 years? This exercise, though elementary, has not been done. We were unable to obtain information from the Société des Traversiers and have not had access to a complete and objective study of the total costs of the Tadoussac crossing and of the onshore facilities supporting it, including the road works.