Study 1979B

Overall Assessment of a Bridge Project over the Saguenay River

Appendix BA

Commissioned by: a senior official, without the knowledge of the Minister of Transport (B2)

The authors

  • The studies department of the Québec Ministry of Transport
  • Ms. Marie-Claire Lévesque, urban planner, et al. (B3). The team also consisted of 5 people from the MTQ whose professional qualifications are not identified.

The structure

b5

Although the author had in hand the preliminary version of the LGL 78 study, which ruled out alignments in the estuary — including near the ferries — as too costly, she nevertheless presented an alignment close to the ferries, thus contradicting the LGL 1979A experts.

No structure is proposed, only an alignment on a modified map.

Main observations

  • At the Ministry of Transport, one team had the mandate to complete the LGL 1979 study by determining, among other things, the alignments of the approach roads to La Boule, the optimal location, and by estimating their costs. At the same time, another team was preparing a contradictory study and another alignment without the knowledge of the authors of the LGL study or of the minister himself (B2).
  • The map on which the alignment is shown was reduced to 93% of its actual size (B6), and a scale that was at 100% of its size was added to it (B5). This falsely created the impression that the main span of the bridge near the ferries would be 1,200 metres, i.e. almost the same span as the optimal option retained at La Boule in the 1979A study, namely 1,150 metres. In reality, when this map is corrected, it is apparent that the project presented would have a span of about 1,300 metres. Moreover, later studies on this site would show a main span varying between 1,420 metres (Study 1999) (E15) and 1,350 metres (Study 2009) (F29).
  • The observations of the 1973 and 1976 studies on the North Shore economy, its dynamism and its importance are contradicted. (B7, B8, B9)
  • The need for a functional road link is trivialized with the argument that North Shore residents travel, and will travel, mainly by air in the future (B8), and that in any case the deficiency of the Côte-Nord road network may help to maintain, in part, a foreseeable state of stagnation in this part of Québec’s territory (B7). The author further demonstrates a poor knowledge of the realities of the region and a lack of confidence in the economic future of the Côte-Nord region and of eastern Canada. It may be noted that barely a few months after the completion of this study, Premier René Lévesque announced a 1-billion-dollar investment in the Alcoa aluminum smelter in Baie-Comeau to launch his 1980 election campaign.
  • The disruptions and risks caused by the ferries are disregarded (K53 to K62), and the fluidity of the road is measured on the basis of the capacity of a 2-lane national highway (B9), thus setting aside the fact that the factor limiting traffic on this road segment is the ferry service and the unpredictability and dangers associated with this crossing, not the capacity of the road.
  • This internal study, carried out without the minister’s knowledge, seemed essentially aimed at discrediting any bridge project and at favouring the maintenance and growth of the ferry service. The arguments presented contradict the engineers and the economics expert, the engineer T.A. Monti, who examined this question. Several elements indicate that this internal study may have been used by senior officials to oust Minister Lucien Lessard, then member for Saguenay and familiar with the road impasse at the mouth of the Saguenay River. The officials did not want a bridge at Tadoussac and may have used this counter-study, made without the Minister’s knowledge, to discredit him with his Montréal colleagues in Cabinet. These manoeuvres by senior officials to oust Ministers at the Ministry of Transport seem to have been repeated over the years and to have made Ministers who wished to ensure their longevity in office “particularly obedient to the wishes of senior officials.” (B10, K79) The Ministers who attempted to “clean house at Transport” — Lucien Lessard, Robert Poëti or Laurent Lessard — lost their positions or, in the case of the current minister, are threatened with losing it.
  • It is astonishing to note that despite the absence of a defined bridge project, despite a falsified map, despite a reductive description of the Côte-Nord region, despite a frivolous treatment of the issue, the Ministry of Transport would persist, in the following decades, in favouring the proposed alignment for a bridge near the ferries (P4). It would base the later studies (1999 and 2009) on this study and on the bridge project it proposes, even though all the earlier independent studies by experts excluded this location and recommended site P1 at La Boule, shorter and more economically advantageous.

To see: