Study 1976

“Cost-Benefit Analysis of a bridge at Tadoussac

Appendix JA

Master’s thesis in economics presented at McGill University in March 1976.

Commissioned by: Independent

The author

  • T.A. Monti, Engineer; PhD, graduate in administration from Harvard, completing his master’s degree in economics at McGill University.

The structure

The same as that of the 1973 study

Main observations

  • It gives a realistic description of the setting and of the issue. A rich and rewarding region with a promising future. (J2)
  • He underlines the importance of the road link given the absence of a rail link and the limited capacity and high costs of air transport (J2)
  • “The ferries are very overloaded in summer and subject to interference from ice in winter.” (J3). The 3-ferry service is saturated and a deterrent for users. (J5, J6)
  • The crossing prevents the fluidity of road traffic and, with the continued growth of the region, this bottleneck will become more and more severe (Appendix J3)
  • The service is provided with 3 ferries in summer and is still overloaded.
  • “This analysis has been based on present conditions. There is no doubt that the bridge would change these conditions over time, and a study undertaken a few years after the opening of a bridge would reflect the new reliance of the region built around an efficient link with central Québec.”(J7)
  • After analysis, the cost of the ferries is higher than the cost of the bridge, even without considering the cost of time lost (J9)

The author concludes that “replacing the ferries with a bridge appears to be an economically viable solution”. (J9)

Already in 1973, 43 years ago, the saturation of the ferries — and therefore of the road of which they are supposed to be the continuation — was being reported. The deterrent effect on traffic caused by this saturation was underlined. The government was also warned of the negative effects on the regional economy of a non-functional road.

This analysis reaches the same conclusions as the independent analysis conducted by the experts of the independent 1986 study (C8, C9) and those of the independent 2015 study (G37): a bridge would bring substantial savings in public funds when its costs are compared with those of the ferries. To date, we have not had access to an objective study of the total costs of the Tadoussac crossing, including but not limited to the wharf and road facilities, the share of costs related to administrative offices, the costs of modernizing the vessels after the first 20 years of use, financing costs and the capital costs of all the facilities, etc.

The Société du Pont sur le Saguenay (SPS) asks the Minister of Transport for an objective and complete analysis to establish all the costs related to the Tadoussac crossing, i.e. those related to the crossing itself, operated by the Société des Traversiers du Québec (STQ), and those related to the work that will be necessary to bring Route 138 up to standard between La Malbaie and Les Escoumins and to maintain traffic flow and road safety on these approach roads.

For more detail: