Appendix IA
Study 1974: Comments on a preliminary profitability study of a proposed bridge project over the Saguenay River between Baie-Sainte-Catherine and Tadoussac, prepared by the consulting engineering firm Gagnon, Monti, Nadon, Freeman et son., April 1973
Commissioned by: Senior official of the MTQ
The author
- Raymond Hamelin, engineer, Office of the Deputy Minister, Québec Ministry of Transport
The structure
Same structure as the 1973 study
Main observations
- The MTQ estimates that traffic at the Tadoussac crossing will be lower because of the possible addition of new ferries on the St. Lawrence River in this region. (Appendix I2)
- The author recalculates the cost of the ferries according to other criteria and on the basis of the cost of the Québec–Lévis ferries.
- He estimates that, given the anticipated rate of traffic growth, building a bridge would not be profitable and that, as traffic grows, the number of ferries could be increased progressively to 4 and then to 6 or more before a cost-benefit ratio over a 50-year period could be calculated. (Appendix I2)
- Cost of the bridge: $55M estimated in April 1974 (I2). The author of the Monti study of April 1973 had submitted a correction note on May 30, 1973, following an evaluation by the firm Janin Construction indicating that the cost of the bridge was $50M rather than the $35M previously estimated. The MTQ author does not appear to have taken note of this. He calculates the cost of the bridge on the basis of the costs of the Pierre-Laporte Bridge in Québec City. (Appendix I3)
- The study aims to cast doubt on, or even contradict, the 1973 Monti study by encouraging the use of ferries for as long as possible — even to the point of a 6-ferry service — and recommends postponing studies on a bridge at Tadoussac.
- There is no analysis of the total costs of the ferries.
- Confusion about discount rates (Appendix I4)