Downloads

All the documents made available by the Société du Pont sur le Saguenay: complete studies and excerpts, briefs, bulletins, presentations and correspondence — 246 documents, grouped by the page that presents and comments on them. Most documents are in French.

Contents — 32 sections

Study 1973 (1)

See the page presenting these documents →

Study 1974 (1)

See the page presenting these documents →

Study 1976 (1)

See the page presenting these documents →

Study 1979A (1)

See the page presenting these documents →

Study 1979B (1)

See the page presenting these documents →

Study 1986 (1)

See the page presenting these documents →

Study 1995 (1)

See the page presenting these documents →

Study 1999 (8)

See the page presenting these documents →

The Naturam-Genivar project (1999) — French page (1)

See the page presenting these documents →

Study 2009 (12)

See the page presenting these documents →

The SNC-Lavalin / GÉNIVAR project (2004) — French page (54)

See the page presenting these documents →

Study 2015 (8)

See the page presenting these documents →

Study 2016 (24)

See the page presenting these documents →

COWI letter to the Ministry of Transport (2020)

Letter from COWI North America, a world specialist in long-span suspension bridges, to the Québec Ministry of Transport, file 3403-19-AA01 (summer 2020), with the sheets of its suspension bridge projects. COWI warns against a call for tenders that required no experience in kilometre-long suspension bridges. See also the article “The hidden number that decides the fate of the Tadoussac bridge“.

BAPE hearings 2016: Tadoussac wharf (7)

Public documents of Quebec’s environmental public hearings office (BAPE), mandate on the dolphin project at the Tadoussac wharf (2016-2017). Links to the BAPE website (in French).

The Studies (7)

See the page presenting these documents →

Archives (51)

See the page presenting these documents →

History of the bridge — English page (3)

See the page presenting these documents →

The Genivar project (1999) — English page (2)

See the page presenting these documents →

The SNC-Lavalin / GENIVAR project 2004 — English page (31)

See the page presenting these documents →

Road safety (3)

See the page presenting these documents →

The traffic flow (1)

See the page presenting these documents →

The costs avoided (1)

See the page presenting these documents →

Environmental impact (2)

See the page presenting these documents →

Security — English page (2)

See the page presenting these documents →

The traffic flow — English page (1)

See the page presenting these documents →

The cost avoided — English page (1)

See the page presenting these documents →

Bravo! The Project Office is coming, but let’s keep our reservations (blog post) (2)

See the page presenting these documents →

Light at the end of the tunnel for the Côte-Nord? (blog post) (1)

See the page presenting these documents →

Why is the Société du Pont sur le Saguenay getting involved with a mooring post (dolphin)? (blog post) (2)

See the page presenting these documents →

A public consultation on road safety concerns us all! (blog post) (2)

See the page presenting these documents →

Documents without an associated page (20)

  • annexe-a (PDF, 2016, file Étude-1979-A-Extraits-Annexe-A.pdf)
  • annexe-b (PDF, 2016, file Étude-1979-B-Extraits-Annexe-B.pdf)
  • annexe-c (PDF, 2016, file Étude-1986-Extraits-Annexe-C.pdf)
  • annexe-d (PDF, 2016, file Étude-1995-Extraits-Annexe-D.pdf)
  • annexe-e (PDF, 2016, file Étude-1999-Extraits-Annexe-E.pdf)
  • annexe-f (PDF, 2016, file Étude-2009-Extraits-Annexe-F.pdf)
  • annexe-g (PDF, 2016, file Étude-2015-Extraits-Annexe-G.pdf)
  • annexe-h (PDF, 2016, file Étude-1973-Extraits-Annexe-H.pdf)
  • annexe-i (PDF, 2016, file Étude-1974-Extraits-Annexe-I.pdf)
  • annexe-j (PDF, 2016, file Étude-1976-Extraits-Annexe-J.pdf)
  • annexe-k (PDF, 2016, file Étude-2016-Extraits-Annexe-K.pdf)
  • annexe-L (PDF, 2016, file Étude-1998-Extraits-Annexe-L.pdf)
  • B&Ta Lettre francais (PDF, 2020, file BTa-Lettre-francais.pdf)
  • filebird (ZIP, 2023)
  • g12-g18 (PDF, 2016)
  • g46-g50 (PDF, 2016)
  • G51a56 (PDF, 2017)
  • LettresMTQroutes (PDF, 2020)
  • MTQ avenant 1 DB8 (PDF, 2020, file MTQ-avenant-1-DB8.pdf)
  • Pont argumentaire 5 avril fin (PDF, 2019, file Pont-argumentaire-5-avril-fin.pdf)