Who we are

The Société du Pont sur le Saguenay is a non-profit organization whose purpose is to open up the Côte-Nord region by replacing the current ferry service with a bridge over the Saguenay River at Tadoussac. It is made up of individuals and representatives of the communities and interest groups of the Côte-Nord, the Capitale-Nationale and the Montréal metropolitan region. Its board of directors includes, among others, representatives of the business, labour, municipal and Indigenous communities.
Our mission
To promote the completion of the road link between the north-eastern region of Canada (Québec’s Côte-Nord and Newfoundland and Labrador) and the rest of the continent through the construction of a bridge connecting Route 138 across the Saguenay River between the villages of Baie-Sainte-Catherine and Tadoussac. Following the engineering firm LGL in 1979 and the architect Pierre Brisset in 1986, we propose building a bridge at La Boule, upstream of the Hydro-Québec power lines. An affordable, elegant bridge project in harmony with its environment.
Welcome

We are proud to present the result of several years of work on the project to build a bridge over the Saguenay River linking Route 138 between Baie-Sainte-Catherine and Tadoussac. This bridge project was initiated in 1973 by the engineer T.A. Monti, PhD and Harvard graduate, together with the international firm of experts Freeman and Fox of London, who were, among other things, the designers of the first bridge over the Bosphorus in Istanbul. You will find this bridge project, updated with the latest technologies, under the Studies tab, in Study 2015.
Our review of the studies carried out since then has led us to some astonishing findings that we wish to share with you.
We wish to thank Mr. Pierre Brisset, a retired architect who has taken an interest in the construction of this bridge for more than 30 years and who presented a bridge project in 1986 in collaboration with two Montréal engineering firms. Thanks also to the engineering firm COWI, internationally recognized for its expertise in the construction of long suspension bridges, which proposed the bridge project in the 1999 study. Many other people have helped us in our efforts, and we sincerely thank them.
State of the situation

The Côte-Nord is a region located in the north-east of the province of Québec; it is bounded to the south by the Gulf of St. Lawrence, to the west by the Saguenay River and to the north by the Nord-du-Québec region. It can also be defined by its extremities: Tadoussac to the west, Blanc-Sablon to the east and Schefferville to the north. Visitors enter the region via the only national highway that gives access to it, Route 138. The entrance to the region is barred by the Saguenay River, 200 kilometres east of Québec City. A ferry service has therefore been operated since the late 1800s between the villages of Baie-Sainte-Catherine and Tadoussac. The construction of a bridge is necessary to replace these ferries, which limit the fluidity and safety of the road while attempting to maintain a semblance of continuity on Route 138. These ferries cause numerous disruptions that prevent them from maintaining their service frequency (variable schedules, mechanical breakdowns, queues, ice, strikes, unbreakable platoons of vehicles leaving the ferry on approach roads without sufficient passing zones, etc.). The unpredictability of travel times and the increased threats to road safety, partly known as the “ferry syndrome”, discourage travel and make the region’s businesses less competitive on continental markets. Let us recall, finally, that the Côte-Nord region is as vast as Norway and that it is the spearhead of the Plan Nord proposed by the current government.
The Québec Ministry of Transport and the Tadoussac bridge
For 12 years, the representatives of the Société du Pont worked in partnership with the officials of the Québec Ministry of Transport (MTQ). Three years ago, after undertaking an in-depth analysis of the earlier studies, we understood that our MTQ partners did not grasp the particularities and complexity of the issues related to a ferry service that is supposed to ensure the continuity of Route 138. Thus, biased information, significant omissions and the imposition of unrealistic choices contributed to the transmission of erroneous information to successive Ministers of Transport. As a result, the decisions taken on the basis of the poor information received were also erroneous. The managers’ desire to act as a “prudent steward” to protect existing jobs at the ferry crossing clearly prevailed over the needs of road users and of taxpayers, who are entitled to projects offering the best value for money. Today, in 2019, we know that the two new ferries will reduce the service previously offered and that they will cost more to operate and finance. To date, including the adjustment of the wharves, they have cost $400M. A bridge is estimated by engineers specializing in the construction of long suspension bridges elsewhere in the world at $250M to $300M (2015). Consider that the ferries entail operating costs of more than $15M per year (salaries of 5 full crews year-round, fuel, repairs, etc.), whereas a bridge requires annual maintenance costs of about 1.25% of its cost, i.e. $3.75M, and the table is set to understand why it is in taxpayers’ interest to have this bridge built. Only a partial reallocation of the money currently dedicated to the ferry crossing and the wharves would be used for the bridge. Substantial and growing savings will accumulate over the years, since such a bridge has a lifespan that can exceed 200 years if well maintained, whereas ferries must be re-engined and modernized after 20 years and have a useful life of only 45 years according to the studies. As the new ferries are versatile, as confirmed by the CEO of the Société des Traversiers, they could be redirected to other crossings where old ferries will soon have to be replaced.
The optimal option at La Boule has been known since 1979

No one at the Société du Pont sur le Saguenay claims to take the place of the experts. That is why we established the optimal project of Study 2015 on the basis of the earlier studies and of similar bridges currently existing elsewhere in the world. Certain new technologies make it possible to substantially lower the costs of this type of bridge, but they do not explain the price differences observed in the latest studies. Already in 1999, the firm of experts Buckland & Taylor set the price of the highway bridge near the ferries at $355M (2015), whereas the SNC-Lavalin/Génivar consortium estimated a bridge at the same location at $860M (2015).
Since the feasibility of the bridge project we present (see Study 2015) has been validated by internationally recognized experts in the construction of long suspension bridges, we asked the Minister of Transport three times for a meeting to discuss this proposal. These meetings were refused. That is why we believe it has become a matter of public interest for this information to be made available to the population.
An interactive table for a better understanding
Thousands of pages of studies have been scrutinized by our analysts, and we make the available information accessible on this site by means of an interactive table that gives access to each of the studies and to texts of findings and comments on each of them.
You will then be able to better perceive the thread running through 40 years of studies, with contradictions, biases and omissions which, for the most part, aimed to discredit the bridge project in favour of the ferries. Over the years, we have become convinced that if the ferry service were private and operating in a competitive environment, successive ministers would have understood more than 40 years ago the recommendation made in the very first study on the subject by a Harvard graduate, the engineer Monti, in 1973. Indeed, already at that time he demonstrated that a bridge would cost taxpayers less than maintaining the ferries.
You will also find in this table the optimal and optimized project under the Study 2015 tab. (See the interactive table of studies)
Unjustified ferries

An analysis of the situation with the ferries is included in Study 2016. (See the 2016 findings) Let us recall, finally, that in September 2009, when the decision was taken to build these two large ferries, barely a few weeks after the publication of the Impact Study of August 2009 recommending the construction of the bridge, the Tadoussac ferries had a service life extending to 2026. The impact study indicated, moreover, that the ferries of the time would do their job until the end of their useful life. The need to replace ferries was at the Sorel crossing. Indeed, the Société des Traversiers plans to transfer the current ferries to Sorel to replace those that are at the end of their useful life there. Investments in the old vessels planned at $8M for the transfer have been raised to $39M, and no tender has been issued and no work has yet begun.
Finally, at this stage, we are continuing our efforts to obtain a meeting with the Minister of Transport. We will ask him to commission an independent and objective update of the existing studies in order to specify the costs of the bridge project at the location recognized as optimal for decades, at the place known as “La Boule”. The time for studies is over; we believe it is now time to act in the interest of all Quebecers.