Let’s be clear! More than 1.5 million passengers pass through the Tadoussac crossing every year. The Premier is worried about the low number of users. Between you and me, what does it matter? Whether there are 500,000 or 5 million.
The only thing that counts is:
How much does a ferry service cost Québec taxpayers compared to a bridge?
And the answers are essentially known:
Cost of the two ferries
Between $324M (according to the Minister of Transport in June 2018) and $354M (according to the loans taken out by the STQ in November 2018 and March 2019, re: p. 47 of the STQ’s 2018-2019 Annual Report) for the 2 boats and $76M for the access ramps and wharf works: Total $400M
PLUS: Recurring annual costs of the crossing: $17M/year for the Tadoussac crossing (average of the last two years according to the STQ’s 2016-2017 and 2017-2018 annual reports. The 2018-2019 annual report shows annual costs of $27M, although the new ferries operated for the equivalent of only 4 months out of 12). Recent results point to higher recurring annual costs in the coming years.
PLUS: the costs related to the reconstruction of the wharves (every 30 years), the mid-life refits of the vessels after 20 years of operation and the construction of new ferries every 45 years (when a well-maintained bridge can last 200 years).
PLUS: the reconfiguration of the access roads to make the road safe and allow the dissolution of the large platoons exiting the vessels on a road that currently lacks the necessary passing zones (including the Tadoussac hill: $50M, and passing lanes: $150M estimated). Total: $200M
PLUS: the costs to Québec’s economy of the delays and waiting due to the numerous disruptions that prevent a reliable service for transporting goods and people.
PLUS: the harm to the competitiveness of North Shore industries, including the tourism and forestry industries.
PLUS: the cost of the harm to road safety (ferry syndrome and others).
PLUS: the cost of the harm to the environment, including the noise pollution threatening the survival of marine mammals, the gas emissions of the vessels and of waiting vehicles, and the nuisance in the heart of the estuary villages of traffic, including heavy vehicles.
Cost of the bridge at La Boule.
Between $250M and $300M (2015) according to the experts who have built similar ones elsewhere. According to them, if well maintained, it can last 200 years.
(See Study 2015 on the site www.ponttadoussac.ca, Studies section – appendices G1 to G18
Let us recall here that the Ministry of Transport has a policy of bypassing North Shore villages to improve traffic flow and road safety (nearly $100M has already been spent in recent years to bypass the villages of Longue-Rive and Portneuf). Bypassing the villages of Tadoussac (800 people) and Baie-Sainte-Catherine (195 people) with the access roads to the bridge at La Boule will cost about $250M (including the tunnel on the left bank).
Total: $500M to $550M for the total bridge project
PLUS: the maintenance costs assessed by the engineers of the earlier studies at 1% of the cost of the bridge ($3M), to which we add the annual maintenance costs of a 600-metre tunnel at the north exit of the bridge ($500K)
Maintenance costs of the bridge-tunnel: $3.5M/year
N.B.: the annualized maintenance costs of the bridge and tunnel will not be spent in the first decades but mainly after several decades, whereas the recurring costs of the crossing apply as soon as the ferries arrive.
PLUS: The access road will be 7 km longer than the current road (23 km instead of 16 currently, including the 1.6 km ferry crossing), i.e. annual road maintenance costs a few hundred thousand dollars higher than at present. This road will be posted at 90 km/h and will avoid passing through the villages at 50 or 70 km/h. (Annual maintenance costs: $200K/year)
So let us put the two projects in perspective:
BRIDGE AT LA BOULE AND ACCESS ROADS: $550M
PLUS: $3.7M in annual maintenance costs (maintenance costs of $3.5M plus $200K for the maintenance of the additional 7 km of approach roads)
FERRIES, WHARVES AND ACCESS ROADS: $600M
(i.e. $400M for ferries and wharf works plus $200M for the works planned on the Tadoussac hill and the works to be planned to build passing lanes to partially restore acceptable traffic flow on Route 138. Total: $600M)
PLUS: $17M annual costs of the Tadoussac crossing (The STQ annual report shows an average of $17M annually for the last two years (considering that the new ferries have a mass 30% greater than the old ones, and greater technical complexity — hybrid propulsion, cooling of the LNG with liquid nitrogen, etc. — maintenance costs will be higher than for the old ferries). This figure is put forward without considering the additional costs related to the crossing cited above.
So common sense can also be measured mathematically: it’s a bridge, while the versatile boats can replace the STQ’s aging ones. Québec taxpayers will thus spare themselves new excesses like those seen with the construction of the last 3 ferries: the F.-A.-Gauthier, the Jos-Deschênes II and the Armand-Imbeau II.
The bridge project is realistic, achievable and desirable for Québec taxpayers, for users of Route 138 and for the future of Québec. A Plan Nord without A completed road makes no sense.
The solution is a bridge!