Changing the attitude and culture of the Ministry of Transport, as Premier Couillard promised
For 40 years, the Québec Ministry of Transport has opposed the construction of the bridge for “internal” reasons.

Although the economic advantages for the province of opening up the Côte-Nord region are known, the Ministry of Transport considers it more important to protect the jobs related to its division, the Société des Traversiers du Québec. A reading of the various studies and the interventions of ministers and of the Premier concerning this unhealthy culture at the Ministry is well reflected in the recent saga of the new, enlarged ferries that were supposed to be delivered 5 years ago when their construction was announced in 2009. The use of stratagems to discredit projects is nothing new and, unfortunately, despite the Premier’s clear wish to change this culture (see the La Presse article of June 9, 2016) more than a year ago, it must be noted that no change is perceptible to the general public.
A region alienated by its own civil servants
At the MTQ Côte-Nord, unreasonable delays are the norm. Everything indicates that those who delay projects the most, or even cause them to fail, are those who rise in the Ministry’s hierarchy.
When we at the Société du Pont met the Côte-Nord Regional Director of Transport Québec, he told us bluntly that in his region no project, however small, can begin before a waiting period of 10 years. This tends to confirm the full application of the Québec Model put in place by governments over the past 50 years (see HMR 70 and RIP-HMR 2003 at www.aviationregionalequebec.com).
Investments and wealth towards the centre; expenses and endless studies towards the regions far from the metropolis.

Here are a few examples of delays or failures programmed by the civil service:
- The rebuilding of the Route des Lacs between Bergeronnes and Tadoussac: announced in 1997 for completion in 2007. At the time, several elected officials and the regional Chamber of Commerce intervened to shorten the far too long timetable for such a project. The Ministry replied that it did not want BAPE public hearings on this project and that, to that end, several mini-worksites of less than 1 kilometre at a time had to be carried out. Had a BAPE hearing been held, it is estimated that all this work would have been completed in 5 or 6 years. The project was to be completed in 2007, 10 years later. In fact, here we are 21 years later and it is still not finished. The whole Côte-à-Arsène section remains to be done.
- The Lower North Shore road file, in which the Ministry put obstacles in the way and which finally failed and ended in legal proceedings.
- The Tadoussac hill: since 2009, the Ministry has known that the arrival of the large ferries requires work on this access hill to the ferry. After 9 years, they are only at the stage of discussions with the municipality of Tadoussac, and no one to date has spoken of an agreement, let alone the start of work.
- Route 389: an improvement program announced in 2009 to be completed in 2019 is only just beginning.
Did you know that while Transport Québec’s Côte-Nord Office was building 40 km of road between Natashquan and Kegaska, our Labrador neighbours were building 1,200 km of quality road and will complete the paving of this Trans-Labrador highway within a few years? And it is not for lack of repeated requests from elected officials and the community to complete Route 138 on the Lower North Shore and with a bridge at Tadoussac.
The 26,000 Labradorians are represented in the St. John’s legislature in Newfoundland by 4 provincial members, one of whom is necessarily Minister of Labrador Affairs. In addition, a federal member represents Labrador exclusively. In Québec, the Côte-Nord has been represented in Québec City by 2 members and no minister since 1980. This profound political insignificance can only be countered by direct citizen involvement.
For several years, state engineers and politicians have agreed that there is a serious shortage of experienced engineers at the MTQ. Private firms took the place of the Ministry’s experts, which led to the abuses denounced at the Charbonneau Commission. The hiring of new engineers has therefore recently begun, but experience remains to be acquired. Also, in our view, the MTQ must get involved in this bridge project through those responsible for the engineering of major projects and not through an understaffed regional office with no experience in the matter. That is why the participation of the Ministry of Transport in the forthcoming Project Office must be limited to competent and objective engineers from the major projects division who can properly prepare the direct negotiation with the only experts able to carry out the project: COWI Int’l Engineering.
Choosing the best experts now to prepare the realization of the project
Only one Canadian firm has the experience and knowledge of the site to build the Tadoussac bridge.

Here are a few images to better understand why the services of the experts of COWI International, who build such bridges for a third of the price proposed by Québec engineers, must be retained.
Considering the problems of the Ministry of Transport, the Tadoussac bridge must be built by the only firm that has the skills, experience and access to the technologies to build the bridge. It is the only one in North America able to deliver such a bridge.
In addition, we ask that the construction work — steel, concrete and roads — be the subject of an international call for tenders and that the timetable allow the bridge to be built as quickly as possible, at the best cost and with the latest technologies.
Construction of the deck of the Hålogaland Bridge at Narvik, Norway, 2016
We already have a benchmark bridge that has undergone all the most severe tests, whose costs are known and which uses the latest technologies: the Hålogaland Bridge at Narvik in Norway. With the help of these experts, we have prepared a bridge project at La Boule that meets the expectations of the community and also meets the legitimate expectations of Québec taxpayers and of those who wish Québec to acquire the transport infrastructure necessary for its economic and social growth. The Société du Pont considers that the work of the Project Office on the Tadoussac Bridge announced by the Premier on August 24 must consist essentially of immediately commissioning a technical and economic study from the recognized experts to objectively and more precisely confirm the parameters of the bridge at La Boule, the costs and the timetable. We wish to avoid as much as possible the influence of companies that would act only as intermediaries without holding the expertise to build such bridges and which, in the end, would be very likely to inflate prices unnecessarily.
The objective here is not to create jobs by building a bridge but rather
to build a bridge to multiply jobs in Québec, and particularly in the east.
It is imperative that the international experts have full latitude and objectivity to prepare the project, and that the MTQ also participate objectively, under strict rules of ethics, in the process if we wish to build the bridge according to best practice, within a predictable timeframe and at costs comparable to other similar bridges elsewhere.
Citizens must be vigilant and ensure that we do not embark once again on one or two decades of futile studies.