In 1973, the experts already recognized that the ferries were saturated. In 1979, Lucien Lessard, then Minister of Transport, received a study (1979-A) concluding, like that of the engineer Monti in 1973 and 1976, that a bridge can be built at Tadoussac. This engineer, a Harvard graduate in administration, reported that replacing the ferries with a bridge would save taxpayers’ money. From then on, for obscure reasons, the Québec Ministry of Transport would persist in carrying out or commissioning studies that would systematically and without justification contradict this position. These studies would settle on an illogical argument according to which only the trend in road traffic could determine when a bridge should be built. Yet the only relevant question on a road whose traffic is limited, even prevented, by the ferries is:

  • How much does the ferry service cost as a whole?
  • What are the costs related to the harm to traffic flow and road safety on Route 138 on the approach to the crossing?
  • What are the economic impacts for the Côte-Nord region of the road impasse at Tadoussac?
  • What are the costs of a bridge and the related advantages and disadvantages?

Similar bridges 3 times cheaper

Never, since the start of the studies on the bridge in 1973, has the Ministry of Transport conducted a serious and independent study of the true costs of the ferries. In Norway, the exercise was done at the Hardanger fjord crossing, a place very similar to the Saguenay crossing at Tadoussac, and it was concluded that a bridge is more advantageous than maintaining ferries. This bridge, completed in 2013 in 4 years, cost $250M, whereas the one proposed by the SNC-Lavalin/Génivar consortium would cost $712M (2004) or $836M (2013). What is the problem?

Comparative table of existing bridges and the Tadoussac bridge project

tabcomparaison

Ferries underestimated threefold

traversier

The Société du Pont sur le Saguenay did the exercise, as the engineer Monti had done in 1973 and 1976, and concludes that it is more advantageous to build a bridge than to maintain ferries operating 365 days a year with at least 5 full crews per day, fuel, maintenance, etc. — whereas the bridge proposed by the Société du Pont can last 200 years, as required by the new European standards. Ferries, for their part, must undergo a major modernization after 20 years and be replaced by new ones every 40 years. The new ferries and the onshore facilities represent a capital expenditure of more than $200M, and the mid-life refits, i.e. the modernization, can cost as much after 20 years.

For example: the 2 current ferries cost $5M each to build in 1980; in 1996 and 1997, their modernization cost $14M each. Of course, 15 car spaces were added to the boats, but by applying the rule of three one finds that the modernization cost $11M per boat, as the Ministry’s reports attest. How much will the mid-life refits of the new ferries cost? These were never assessed in the studies sponsored by the Ministry in 1999 and 2009. The cost-benefit analyses presented were more akin to humbug than to rigorous and objective work.

An in-depth analysis of the existing bridge studies reveals several anomalies.

brain-question

By consulting the studies tab of the site, you will be able to see all the manoeuvres used by the Ministry of Transport to prevent the construction of this bridge. The economic, environmental and socio-economic arguments do not justify maintaining the ferries. Proposing a bridge that will cost 3 times more than similar bridges elsewhere in the world does not hold water. Suggesting that replacing the ferries with new ones will cost 3 times less than the real costs known to date; requiring 6.5 km of highway tunnels to the La Boule site in 1999 to discredit the optimal construction site; accepting a project near the ferries with a 1.2 km tunnel and then, 3 years later, doing a U-turn and requiring that the road to the optimal site in 2009 contain no tunnel and that the bridge be built in the estuary near the ferries — an alignment ruled out as early as 1979 by the expert engineers as too expensive: so many illogical decisions that distorted the quality and relevance of the information transmitted to the minister. This biased information led to bad decisions. Fortunately, boats can be moved and operate at other crossings. A reading of the analysis of the studies produced over 43 years will allow you to better understand the questionable methods used by the Ministry to inflate certain costs and to avoid considering others, thus distorting the information transmitted to elected officials.

A simplified example

Since the Tadoussac bridge file contains thousands of pages accumulated over more than 40 years, we thought we would summarize the issue as follows.

Let us compare the Québec government’s choice for crossing the Saguenay River to a buyer who comes to the dealership to buy a new car.

He is offered three options:

Option 1:

  • Acquisition cost: $20,000.00
  • Operating costs: Three drivers are needed to ensure operation day and night year-round, fossil fuels, maintenance and the necessary onshore facilities (garage, etc.)
  • Operating costs: $1,400.00 every 18 days,

After 1 year: Major modernization, re-engining: 50% of the purchase price

  • Lifespan: 2 years, after which a new vehicle must be purchased

Option 2:

  • Acquisition cost: $86,000.00
  • Operating costs: None — no driver, no fuel, no modernization or re-engining (e.g. a solar-powered vehicle)
  • Maintenance costs: 0.75% of the purchase price every 18 days, i.e. $645.00 every 18 days
  • Lifespan: 10 years

Option 3:

  • Acquisition cost: $27,500.00
  • Operating costs: None, same as option 2
  • Maintenance costs: 1% of the purchase price every 18 days, i.e. $275.00 every 18 days
  • Lifespan: 10 years

The amounts and conditions stated are a scaled-down picture of the choices facing the MTQ concerning the Saguenay crossing at Tadoussac. Time is reduced to 1/20th of reality, and the amounts in 2015 dollars are reduced to one ten-thousandth, i.e. divided by 10,000.

What would your choice be if you were using your own money?

Option 1 represents the construction of new ferries. The known price is $200M, adjusted to $20,000.00 for option 1, but could rise further considering the numerous delays (already 3 years late in delivery) and no official delivery date. They have a lifespan of about 40 years and must undergo a major modernization after 20 years costing more than 50% of the acquisition price (e.g.: in 1980 each of the current ferries cost $5M to build; the costs of the mid-life refit (modernization) in 1997 amounted to $14M per boat, including an enlargement of the ferries by 15 car spaces (from 60 to 75 car spaces)). Moreover, in recent years operating costs have been about $14M annually, hence the $1,400.00 in costs every 18 days (1/20th of 1 year).

Option 2 represents the bridge project proposed by the SNC-Lavalin/Génivar consortium and the MTQ in the 2009 study.

Option 3 represents the optimal option recognized by the independent experts at La Boule and is detailed in the 2015 study.

This simplified example represents in a few words the current choices of the Minister of Transport. The Study 2015 documents were sent to him in May 2016, and the other studies are available directly from the MTQ.

Finding: a bridge is more cost-effective than the ferries

However, while we are able to show that for more than 40 years it would have been more cost-effective to build a bridge than to operate ferries, we cannot clearly pinpoint the Ministry of Transport’s motives for opposing, against all logic, the opening up of the Côte-Nord region. On its face, the construction of a bridge at Tadoussac is desirable for Québec taxpayers, for the development of the Plan Nord region and for the economy of Québec and of Eastern Canada.

Happy reading. With this site, we wanted to make available to members as much information as possible on the Tadoussac bridge project, and if you are looking for answers, do not hesitate to contact us.

La Société du Pont sur le Saguenay à Tadoussac

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *