Route 138 · Tadoussac – Baie-Sainte-Catherine

Completing Route 138: a bridge over the Saguenay at Tadoussac

An affordable, elegant bridge project in harmony with its environment, at the La Boule site — the optimal option recognized by experts since 1979.

Projet de pont sur le Saguenay à Tadoussac

100+ years

of official requests for a bridge, since 1909

12 studies

carried out since 1973, analyzed page by page

$55M / year

operating costs of the Tadoussac ferry crossing

1,150 m

main span at the La Boule site, the narrowest point of the fjord

Understand the project in 10 minutes

Two videos to grasp the essentials: a hundred years of history of a promised bridge, and what the Norwegians built for a fraction of the price announced in Québec. (Videos in French.)

Capsule 1 – The history of the Tadoussac bridge project (5 min, in French)
Hunting Norwegian bridges – Pierre Breton in Norway, spring 2017 (in French)

Why a bridge over the Saguenay?

What is at stake: from road safety to opening up the region and protecting marine mammals.

All the facts →

The “ferry syndrome”: exit platoons, queues and risky passing on the approach roads.

Read →

Variable schedules, mechanical breakdowns, ice and strikes: a national link that depends on a boat.

Read →

A bridge is maintained for about 1.25% of its cost per year; the ferry crossing costs more than $55M a year to operate.

Read →

A bridge at La Boule, upstream of the Hydro-Québec lines, and the protection of the estuary’s marine mammals.

Read →

Predictable access to the Côte-Nord for visitors who enter by the only national highway, Route 138.

Read →

Connecting the Côte-Nord, Newfoundland and Labrador to the rest of the continent by a road completed at both ends.

Read →

Regional businesses competitive on continental markets thanks to predictable travel times.

Read →

The studies, from 1973 to 2025

Discover each of the studies through our interactive table, along with our findings, comments and the complete studies.

All the studies →

1999

Buckland & Taylor / COWI — experts in long suspension bridges

253 M$ (1999)

2009

SNC-Lavalin / Génivar consortium

712 M$ (2003)

2025

Ministry of Transport — unpublished study

4,2 G$ (2025)