Route 138 · Tadoussac – Baie-Sainte-Catherine
Completing Route 138: a bridge over the Saguenay at Tadoussac
An affordable, elegant bridge project in harmony with its environment, at the La Boule site — the optimal option recognized by experts since 1979.

Québec election · October 5, 2026
Featured
Our latest analyses, to ask your candidates the right questions.
-

Before October 5: three questions for the parties about the Tadoussac bridge
Will you publish the 2025 study? Will you let international competition propose the best bridge? Will you make Route 138 a project of national…
-

The hidden number that decides the fate of the Tadoussac bridge
A single number, the discount rate, is enough to make the Tadoussac bridge look profitable or not. With the 2009 study’s own figures and…
-

Bridge or ferries at Tadoussac: what the numbers say
The $4.2 billion price tag circulates as an established truth, but the study behind it was never published. The Tadoussac ferry figures are public:…
100+ years
of official requests for a bridge, since 1909
12 studies
carried out since 1973, analyzed page by page
$55M / year
operating costs of the Tadoussac ferry crossing
1,150 m
main span at the La Boule site, the narrowest point of the fjord
Understand the project in 10 minutes
Two videos to grasp the essentials: a hundred years of history of a promised bridge, and what the Norwegians built for a fraction of the price announced in Québec. (Videos in French.)
Why a bridge over the Saguenay?
What is at stake: from road safety to opening up the region and protecting marine mammals.
Road safety
The “ferry syndrome”: exit platoons, queues and risky passing on the approach roads.
Traffic flow on the road link
Variable schedules, mechanical breakdowns, ice and strikes: a national link that depends on a boat.
The costs avoided
A bridge is maintained for about 1.25% of its cost per year; the ferry crossing costs more than $55M a year to operate.
Environmental impact
A bridge at La Boule, upstream of the Hydro-Québec lines, and the protection of the estuary’s marine mammals.
Opening up the North-East of the country
Connecting the Côte-Nord, Newfoundland and Labrador to the rest of the continent by a road completed at both ends.
Industrial development
Regional businesses competitive on continental markets thanks to predictable travel times.
The studies, from 1973 to 2025
Discover each of the studies through our interactive table, along with our findings, comments and the complete studies.
If you want to know everything about the bridge
Latest developments, general meetings, etc.: all you need to do is become a member of the Société du Pont sur le Saguenay!